Multi-processor SoC system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11378954
APP PUB NO 20180143633A1
SERIAL NO

15636081

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-processor architecture for automated driving systems can be used to improve performance and provide design flexibility. For example, a multi-processor architecture can be used to implement command generation and safety functionality in different processors. The command generation processor can be a high performing processor compared with the safety processor. The safety processor can verify the safety of commands output from the command generation processor and provide additional I/O channels that are typically absent on high performing processors. Additionally, processing of some sensor data can be moved to expansion modules with additional processors to reduce bottlenecks and provide design flexibility for systems with different sensing requirements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FARADAY&FUTURE INC18455 S FIGUEROA ST GARDENA CA 90248

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bae, Hong S Torrance, US 26 483
Batur, Aziz Umit Torrance, US 58 810
Halder, Bibhrajit Sunnyvale, US 33 647
Hong, Michael Irvine, US 31 1320
Paryani, Anil Cerritos, US 45 681

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 5, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00