Pressure activated recharging cooling platform

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11375685
SERIAL NO

17687121

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressure activated recharging cooling platform for cooling an object is provided. The cooling platform comprises a temperature regulation layer, a support layer, and a channeled covering layer. The temperature regulation layer is adapted to hold a composition. The temperature regulation layer has a plurality of angled segments, wherein angled segments within a sealed perimeter of the temperature regulation layer are formed by a top side and a bottom side at a predefined distance, and channels, wherein the channels substantially form sides by contacting the top side with the bottom side at a distance lesser than the predefined distance. The support layer is substantially bonded to the bottom side of the temperature regulation layer and is comprised of material sufficiently pliable to deform and sufficiently rigid to withstand collapse in response to the weight of the object. The channeled covering layer encompasses the support and temperature regulation layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE GREEN PET SHOP ENTERPRISES LLCDEERFIELD IL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Prendergast, Gerard Chicago, US 8 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 5, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00