Combine harvester and discharge assembly of the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11375661
APP PUB NO 20190110398A1
SERIAL NO

15785098

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combine harvester includes a housing, a separating system mounted within the housing for separating a seed material from a straw material, a cleaning system including a cleaning fan configured to produce a motive flow of air, a straw chopper operable to chop the straw material from the separating system into a chopped straw material, a spreading system positioned downstream of the straw chopper and configured to disperse the chopped straw material outside of the housing of the combine harvester, and an air discharge channel located downstream of the straw chopper and above the spreading system and configured to discharge a portion of the motive flow of air produced by the cleaning fan.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Faulkner, Christopher J Eldridge, US 11 34
Fuchs, Volker Bettendorf, US 36 107
Mattson, Mark L East Moline, US 11 285
Puryk, Corwin M Bettendorf, US 36 242

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 5, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00