Rubber composition, crosslinked product, and tire

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11370900
APP PUB NO 20200087490A1
SERIAL NO

16542473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rubber composition contains (A) a modified conjugated diene-based polymer, (B) modified silica, and (C) a polymer having crystalline character. A crosslinked product is produced through crosslinking of the rubber composition containing the modified conjugated diene-based polymer (A), the modified silica (B), and the polymer having crystalline character (C). The crosslinked product is used for producing a tire including a tread and a sidewall, wherein at least one of the tread and the sidewall is formed of the crosslinked product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENEOS MATERIALS CORPORATION5-2 HIGASHI-SHIMBASHI 1-CHOME MINATO-KU TOKYO 1057109 ?1057109

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kobayashi, Kunpei Minato-ku, JP 46 506
Sugiyama, Naoki Minato-ku, JP 106 1458
Tanaka, Ryoji Minato-ku, JP 44 198
Tani, Koichiro Minato-ku, JP 21 463

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00