Combined convector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11365938
APP PUB NO 20170082370A1
SERIAL NO

15310926

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A convector for air cooling of a fluid flowing in a pipe, comprising: a path for a cooling air flow comprising an inlet from and an outlet towards the environment, a heat exchange section comprising at least one tube bundle defining a heat exchange surface, said section being provided in said path for the air flow, fan means producing said air flow along said path, so that said air flow externally invests said tube bundle on said; heat exchange surface, a humidifying section arranged in said path, upstream of said heat exchange section, where water is atomized to be invested by the air flow, characterized by comprising a wetting device for wetting directly with water a portion of the heat exchange surface of said tube bundle to further cool said portion of tube bundle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FRIGEL FIRENZE S P AITALY FLORENCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dorin, Filippo Florence, IT 3 19
Strumenti, Francesco Monsummano Terme, IT 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00