Systems and methods for treating a surface of a coke plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11365355
APP PUB NO 20200208060A1
SERIAL NO

16729036

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present technology relates to systems and methods for reducing leaks in a system for coking coal. For example, some embodiments provide systems and method for treating a cracked or leaking surface in a system for coking coal. In particular, the present technology includes systems having one or more substances configured to reduce an airflow through one or more cracks by creating an at least partially impermeable patch. The present technology further includes methods for treating surfaces having one or more cracks to reduce an airflow through the one or more cracks.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNCOKE TECHNOLOGY AND DEVELOPMENT LLC1011 WARRENVILLE ROAD 6TH FLOOR LISLE IL 60532

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fernandez, Mayela Carolina Lisle, US 7 192
Quanci, John Francis Haddonfield, US 92 2799
West, Gary Dean Lisle, US 19 573

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00