Production plant for producing a chemical product by reacting H-functional reactants with phosgene, and method for operating same with an interruption to production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11365172
APP PUB NO 20210147346A1
SERIAL NO

16622585

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for operating a production plant for producing a chemical product (1) by reacting a H-functional reactant (2) with phosgene (3) during an interruption in production when taking at least one plant part of the production plant out of operation, wherein low-oxygen and oxygen-rich phosgene-containing exhaust gas flows are directed separately from one another in different phosgene decomposition directions and separately from one another—at spatially different points—into a combustion device, wherein plant parts that have not been taken out of operation are operated in a closed-circuit operating mode. The invention also relates to a production plant for producing a chemical product by reacting H-functional reactants with phosgene, which is suitable for being operated with the method according to the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COVESTRO DEUTSCHLAND AGKAISER-WILHELM-ALLEE 60 LEVERKUSEN 51373

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knauf, Thomas Dormagen, DE 60 250
Manzel, Dirk Moers, DE 7 2
Plathen, Peter Krefeld, DE 7 5
Spriewald, Juergen Seabrook, US 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00