Material handling device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11364595
APP PUB NO 20200406428A1
SERIAL NO

16453176

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A material handling device for use in manipulating a tubular substrate includes a C-clamp, which in turn comprises a movable jaw that is pivotally coupled to a fixed jaw. A handle is coupled to and extends from an outer surface of the fixed jaw. An actuator is coupled to the fixed jaw. The actuator is operationally coupled to the movable jaw so that the actuator is positioned firstly to pivot the movable jaw relative to the fixed jaw to position the C-clamp in an open configuration, and, secondly, to pivot the movable jaw relative to the fixed jaw to position the C-clamp in a closed configuration. In the open configuration, the C-clamp is configured to insert a tubular substrate. In the closed configuration, the C-clamp couples to the tubular substrate, positioning a user to grasp the handle to manipulate the tubular substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARTIN SR GERALD AWINTERSVILLE OH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Martin,, Sr Gerald A Wintersville, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00