Methods and systems for optimizing mechanical vapor compression and/or thermal vapor compression within multiple-stage processes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11364449
APP PUB NO 20220016542A1
SERIAL NO

17374962

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention utilizes mechanical vapor compression and/or thermal vapor compression integrating compression loops across multiple process stages. A sequential network of compressors is utilized to increase the pressure and condensing temperature of the vapors within each process stage, as intra-vapor flow, and branching between process stages, as inter-vapor flow. Because the vapors available are shared among and between compressor stages, the number of compressors can be reduced, improving economics. Balancing vapor mass flow through incremental compressor stages which traverse multiple process stages by splitting vapors between compressor stages enables the overall vapor-compression system to be tailored to individual process energy requirements and to accommodate dynamic fluctuations in process conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERGY INTEGRATION INC710 SUNSHINE CANYON DRIVE BILL SCHAFER CEO BOULDER CO 80302

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crawford, Lynn Allen Aurora, US 10 47
Schafer,, III William Bryan Boulder, US 10 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00