Finned strainer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11361870
APP PUB NO 20180025798A1
SERIAL NO

15611776

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to filters used to remove debris from water being sucked into a piping system. It has particular application use in nuclear power plants, which, after a loss of coolant accident, must pump cooling water back into the reactor core from a collection sump. This water may contain various types of debris that must be removed before the water is sent back into the reactor cooling system. There are restrictions on the allowable pressure drop across the strainer and the space available for installing this equipment. The finned strainer of the present invention addresses these issues while maximizing the quantity of debris filtered from the water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ATOMIC ENERGY OF CANADA LIMITEDCHALK RIVER LABORATORIES CHALK RIVER K0J1J0

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
MacGregor, James Edward Allen Pembrooke, CA 1 2
Rhodes, David Bruce Deep River, CA 8 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00