Multi-component solid epoxy proppant binder resins

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11359475
APP PUB NO 20210040833A1
SERIAL NO

16934964

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and materials for sand control in water injection sites are disclosed. Proppant particles may be coated with some particles coated with a solid epoxy and other proppant particles coated with a solid epoxy curative (such as amine, hydroxyl, carboxyl, anhydride) that would bind the particles through an epoxy reaction. The invention may be advantageous for forming underground structures useful in the extraction of hydrocarbons.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BATTELLE MEMORIAL INSTITUTE902 BATTELLE BOULEVARD RICHLAND WA 99354

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Denen, Phillip N Reynoldsburg, US 7 4
Elhard, Joel D Hilliard, US 23 244
Whitmore, Robert S Lexington, US 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00