Harvesting machine including a crop residue deflector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11357171
APP PUB NO 20210227751A1
SERIAL NO

16752869

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sugarcane harvester for harvesting sugarcane including a cutter configured to cut sugarcane into a sugarcane mat and a primary extractor disposed adjacent to the sugarcane mat configured to remove crop residue from the sugarcane mat. An elevator includes a conveyor to move the sugarcane mat to an end of the conveyor and an extractor is operatively connected to the elevator. The extractor includes a fan housing having an arm extending laterally from a sidewall of the fan housing and toward a center of the fan housing. A fan assembly is supported by the arm and is configured to remove crop residue from the sugarcane mat at the end of the conveyor. A cover assembly is fixedly connected to the support arm and subtends a fan of the fan assembly and a portion of the support arm, wherein the cover assembly directs crop debris away from the fan and the support arm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE GLOBAL INTELLECTUAL PROPERTY SERVICES MOLINE IL 61265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fattepur, Surfraj Bijapur, US 10 14
Hansen, Matthew J Thibodaux, US 17 124
Rodrigue, Todd J Thibodaux, US 10 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00