Motor and electric power steering system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11355994
APP PUB NO 20200177045A1
SERIAL NO

16636382

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bush attached to a through hole of a casing of a motor holds a conductor. The bush includes a main body, an insertion hole, a flange, and a rib. The main body includes a first end surface, a second end surface facing the first end surface in a first direction, and side surfaces between the first end surface and the second end surface. The insertion hole penetrates an inside of the main body in the first direction, and allows the conductor to pass through. The flange protrudes from a side surface in a direction perpendicular or substantially perpendicular to the first direction. The rib protrudes from the side surface in a direction perpendicular or substantially perpendicular to the first direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIDEC CORPORATION338 TONOSHIRO-CHO KUZE MINAMI-KU KYOTO-SHI 601-8205

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hisada, Takahiro Kyoto, JP 6 18
Kizu, Takahiro Kyoto, JP 15 70
Kozu, Ryosuke Kyoto, JP 1 1
Nishikawa, Yuichi Kyoto, JP 18 89
Oyama, Takanobu Kyoto, JP 6 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00