Non-neutral plasma energy storage and reconverter system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11353008
APP PUB NO 20210332804A1
SERIAL NO

17238747

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy storage system includes a plasma battery and a reconverter to convert energy stored in the plasma battery to electricity. The plasma battery and the reconverter are coupled by a non-neutral plasma duct. The plasma battery includes a plasma battery supercell. The plasma battery supercell includes a plasma battery cell which includes a plasma containment fiber. The plasma containment fiber includes one or more concentric shells to store non-neutral plasma ions for energy storage. The plasma battery may include additional plasma battery supercells, which may be separated by a separator. The plasma battery includes an enclosure to provide electromagnetic shielding. The reconverter includes a power outlet to power an electric load.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SPAR SYSTEMS INC70 N KINDERKAMACK RD MONTVALE NJ 07645

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bazaz, Gaurav Montvale, US 22 289

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00