Child bike seat and method of assembling a child bike seat

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11352085
APP PUB NO 20210214032A1
SERIAL NO

17143834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A child bike seat includes a seat body having a seat shell for accommodating a child therein and a support structure for supporting the seat shell. The support structure includes two parts, with an edge portion of the seat shell disposed between the two parts of the support structure for holding the seat shell on the support structure. A method of assembling a child bike seat includes providing a frame part, arranging a seat shell for accommodating a child therein on the frame part, mounting a cover part to the frame part such that an edge portion of the seat shell is disposed between the frame part and the cover part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THULE SWEDEN ABWHAT TOP HILLER OF SWEDEN HILLERSTORP VASTRA GOTALAND

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Jong Reinoud Gorinchem, NL 4 6
Larsson, Germund Reftele, SE 2 4
Mauritzson, Gustav Jönköping, SE 1 1
Nieuwenhuis, Albert Geldermalsen, NL 6 18
Nordangärd, Markus Värnamo, SE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00