Method for operating a high-voltage pulse system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11351556
SERIAL NO

16328344

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for operating a high-voltage pulse system (1), preferably a system (1) for the fragmenting and/or weakening of material (2) by means of high-voltage discharges, with an energy store (3) for providing the energy for the high-voltage pulses and a charging device (4) for charging the energy store (3). According to the method, in the intended high-voltage pulse operation, a sequence of high-voltage pulses is generated with the system (1) and thereby the energy store (3) is discharged completely at each high-voltage pulse and is only after the expiry of a charging pause (LP) recharged again for the next high-voltage pulse by means of supplying charging energy with the charging device (4).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SELFRAG AG3210 KERZERS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kalke, Jürgen Müntschemier, CH 1 0
Müller-Siebert, Reinhard Bern, CH 9 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00