Power supply control device and power supply control method for controlling switching device of boost chopper

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11349394
APP PUB NO 20210013806A1
SERIAL NO

17033918

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply control device includes a switch control unit configured to control ON/OFF of a switching device of a boost chopper by using an oscillation wave, a comparison voltage generating unit configured to charge or discharge comparison capacitor that generates a comparison voltage for comparison with the oscillation wave in correspondence with a DC output voltage outputted from the boost chopper, an input increase detecting unit configured to detect whether a detection value corresponding to current flowing through the boost chopper has increased to or above a detection criterion, an output voltage detecting unit configured to detect whether the DC output voltage is at or above the lower limit voltage, a discharging unit configured to discharge the comparison capacitor when the detection value has increased to or above the detection criterion and the DC output voltage is at or above the lower limit voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJI ELECTRIC CO LTDKAWASAKI-SHI KANAGAWA 210-0856

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yaguchi, Yukihiro Matsumoto, JP 20 211

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00