Conformal array antenna

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11349224
APP PUB NO 20200153118A1
SERIAL NO

16742327

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conformal array antenna includes a substrate and a conductive circuit. The substrate has a non-conductive roughened curved surface formed with a plurality of hook-shaped structures that are formed by blasting a plurality of particles on the substrate. The non-conductive roughened curved surface defines a plurality of spaced-apart antenna pattern regions. The conductive circuit is located in the antenna pattern regions, and includes an activation layer formed on the roughened curved surface and containing an active metal, and a first metal layer formed on the activation layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN GREEN POINT ENTERPRISES CO LTDNO 256 SEC 1 SHENLIN RD DAYA DIST TAICHUNG CITY 42865

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Po-Cheng Taichung, TW 64 300
Liao, Pen-Yi Taichung, TW 39 77
Wu, Tsung-Han Taichung, TW 47 159
Yi, Sheng-Hung Taichung, TW 23 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00