Multi-use test lead

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11346865
APP PUB NO 20200150151A1
SERIAL NO

16680144

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A test lead for an electrical meter is provided. The test lead comprises a flexible elongate member comprising a current sensing coil at least partially disposed about a flexible core along the length of the member. A first connector is disposed at one end of the member for coupling a respective end of the current sensing coil to a test port of an electrical meter. A second connector is disposed at an opposing end of the member for coupling a respective end of the current sensing coil to an electrically conductive member, to provide an electrical path, via the sensing coil, from the electrically conductive member to the first connector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEGGER INSTRUMENTS LTDARCHCLIFFE ROAD DOVER KENT CT17 9EN CT17 9EN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aaronovitch, Sidney Dover, GB 1 0
Zurek, Stanislaw Dover, GB 10 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00