Sequencing for pipe handling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11346164
APP PUB NO 20200284106A1
SERIAL NO

16826886

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method sequence for handling tubulars into or out of a wellbore, the method comprising: moving a tubular string into or out of a wellbore via a top drive; moving tubular stands to and from a setback position and a stand handoff position via a transfer bridge racker and a setback guide arm; moving tubular stands to and from the stand handoff position and a well center position via a tubular delivery arm and a lower stabilizing arm; building stands and breaking down stands offline via a mousehole and operating a roughneck on joints between the tubular stands and the tubular string.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHLUMBERGER TECHNOLOGY CORPORATIONSUGAR LAND TX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alvaer, Jan Kristiansand, NO 4 20
Berry, Joe Rodney Cypress, US 27 191
Nilssen, Christian Doennestad Kristiansand, NO 6 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00