Method and device for processing of filter material, product obtained thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11346029
APP PUB NO 20190017202A1
SERIAL NO

16069901

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Filter material, mainly in form of industrial remnants from the production of the filter fillings, is processed without the intake of the heat in such a way that it is cut in the disintegrator (4) at the presence of the air, where the material is during retention time repeatedly led to the contact with the rotating blades and bunches emerge in the disintegrator (4) through aeration. The flat carrier (3) is thus at least partially disintegrated to the original fibers (1); the released fibers (1) intertwine into bunches and the active carbon (2) is released from the original bond with the flat carrier (3). The swirl (vortex) created inside the disintegrator (4) carries the dust particles of the active carbon (2) and they adhere to the surface of the fibers (1). Part of the released active carbon (2) is—after the separation—carried away from the emergin bunches, which in the lower part of the disintegrator (4) run through the sieve out of the disintegrator (4). The resulting product is advantageously applicable as heat and noise isolation in all fields of technology, for example construction. The separated active carbon (2) in form of granules is also a resulting product of processing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CESKO VLADIMIR018 61 BELUSA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cesko, Vladimir Belusa, SK 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00