Video signal conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11343466
APP PUB NO 20210067736A1
SERIAL NO

17095779

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A video signal conversion device includes a frontend interface circuit, a FPGA video processor and a backend interface circuit. The frontend interface circuit receives a HDR video input signal from a video transmitting device. The FPGA video processor outputs a SDR first video output signal. A video receiving device receives the first video output signal and a HDR second video output signal from the FPGA video processor through the video bridge controller of the backend interface circuit by PCI-E.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVERMEDIA TECHNOLOGIES INCNO 135 JIAN 1ST RD ZHONGHE DIST NEW TAIPEI CITY 235

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Ssu-Ming New Taipei, TW 4 4
Lin, Shi-Jie New Taipei, TW 4 1
Liu, Hong-Wei New Taipei, TW 11 19
Wang, Chih-Sheng New Taipei, TW 23 428
Wu, Chen-Hsiang New Taipei, TW 3 1
Yao, Yen-Cheng New Taipei, TW 7 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00