Electrolyte for electrochemical decontamination and preparation method and application thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11342092
APP PUB NO 20220102020A1
SERIAL NO

17485867

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrolyte for electrochemical decontamination and a preparation method and application thereof. The electrolyte is an aqueous solution including the following solutes: phosphoric acid, oxalic acid, citric acid, tartaric acid, hydrogen peroxide and glacial acetic acid. The electrolyte has a good decontamination effect and allows for fast decontamination and is obtained by reasonably combining different types of solutes and controlling the levels of the solutes and resulting secondary waste solution and residues are easy to treat. The electrolyte is suitable for overall or local electrochemical decontamination of radioactively contaminated stainless steel scrap.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA NUCLEAR SICHUAN ENVIRONMENTAL PROTECTION ENGINEERING CO LTDSANDUI TOWN LIZHOU DISTRICT GUANGYUAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Yanmin Guangyuan, CN 1 0
Di, Yutong Guangyuan, CN 1 0
Gu, Wenjie Guangyuan, CN 4 501
Xu, Liguo Guangyuan, CN 1 0
Zhao, Lingjun Guangyuan, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00