Gas turbine combustor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11339969
APP PUB NO 20210095850A1
SERIAL NO

17036575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Adhesion of particulate matters to the burner accompanying combustion in a lean-combustion gas turbine combustor is suppressed, and the structural reliability is improved. In a gas turbine combustor including: a tubular liner that forms a combustion chamber; and a burner including an air hole plate that is arranged at an inlet of the liner and includes a plurality of air holes for guiding compressed air to the combustion chamber, and a plurality of fuel nozzles that are arranged on a side opposite to the combustion chamber with the air hole plate being sandwiched therebetween, the plurality of fuel nozzles each injecting a fuel toward a corresponding air hole, the air holes and the fuel nozzles forming a plurality of concentric annular lines, a plurality of small holes having opening diameters smaller than those of the air holes are provided through the air hole plate such that the plurality of small holes are positioned in an inner area of an innermost annular line of the air holes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akiyama, Yasuhiro Yokohama, JP 44 616
Asai, Tomohiro Tokyo, JP 27 210
Hayashi, Akinori Yokohama, JP 50 422
Hirata, Yoshitaka Yokohama, JP 42 504
Yoshida, Shohei Yokohama, JP 132 1208

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00