Dual fuel lance with cooling microchannels
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
May 24, 2022
Grant Date -
Mar 5, 2020
app pub date -
Aug 1, 2019
filing date -
Aug 30, 2018
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A lance for a burner includes an innermost conduit defining a first fluid passage and a plurality of first fuel injection channels, each first fuel injection channel terminating at a first outlet; an intermediate conduit circumferentially surrounding the innermost conduit, the intermediate conduit defining a second fluid passage and a plurality of second fuel injection channels, each second fuel injection channel terminating at a second outlet; an outermost conduit circumferentially surrounding the intermediate conduit, the outermost conduit defining a third fluid passage, a plurality of third air outlets through the outermost conduit and surrounding the first outlets, a plurality of fourth air outlets through the outermost conduit and surrounding the second outlets, and a plurality of cooling microchannels; wherein each cooling microchannel includes and extends between a microchannel inlet in fluid communication with the third fluid passage and a microchannel outlet on an outer surface of the outermost conduit.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
GE INFRASTRUCTURE TECHNOLOGY LLC | 300 GARLINGTON ROAD GREENVILLE SC 29615 |
International Classification(s)

- 2019 Application Filing Year
- F23R Class
- 290 Applications Filed
- 207 Patents Issued To-Date
- 71.38 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Biagioli, Nico | Baden, CH | 11 | 68 |
# of filed Patents : 11 Total Citations : 68 | |||
Kulkarni, Rohit Madhukar | Villnachern, CH | 1 | 3 |
# of filed Patents : 1 Total Citations : 3 | |||
Pudrlja, Mario | Karlovac, HR | 1 | 3 |
# of filed Patents : 1 Total Citations : 3 | |||
Theuer, Andre | Baden, CH | 22 | 179 |
# of filed Patents : 22 Total Citations : 179 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F23R Class
- 0 % this patent is cited more than
- 3 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Nov 24, 2025 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Nov 24, 2029 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Nov 24, 2033 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Jun 04, 2024 | P | Publication | |
May 15, 2024 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Apr 30, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Jan 31, 2024 | ZAAB | NOTICE OF ALLOWANCE MAILED | free format text: ORIGINAL CODE: MN/=. |
Jan 29, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
Jan 05, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Sep 27, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: FINAL REJECTION MAILED |
Sep 01, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
May 25, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Aug 11, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Aug 04, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Jul 11, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE AFTER FINAL ACTION FORWARDED TO EXAMINER |
Apr 27, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: FINAL REJECTION MAILED |
Mar 06, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Dec 01, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Oct 01, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Jul 28, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
May 19, 2021 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CLIFTON, CODY D.;ROCHOLL, JOSHUA D.;WECKWERTH, CLINTON T.;AND OTHERS;SIGNING DATES FROM 20200828 TO 20210506;REEL/FRAME:056419/0332 Owner name: OSHKOSH CORPORATION, WISCONSIN |
Apr 25, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Nov 05, 2020 | P | Published | |
May 15, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: APPLICATION DISPATCHED FROM PREEXAM, NOT YET DOCKETED |
Apr 17, 2020 | F | Filing | |
Apr 17, 2020 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |

Matter Detail

Renewals Detail
