Multi-material integrated knit thermal protection for industrial and vehicle applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11339509
APP PUB NO 20190145027A1
SERIAL NO

16249433

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Knit fabrics having ceramic strands, thermal protective members formed therefrom and to their methods of construction are disclosed. Methods for fabricating thermal protection using multiple materials which may be concurrently knit are also disclosed. This unique capability to knit high temperature ceramic fibers concurrently with a load-relieving process aid, such as an inorganic or organic material (e.g., metal alloy or polymer), both small diameter wires within the knit as well as large diameter wires which provide structural support and allow for the creation of near net-shape performs at production level speed. Additionally, ceramic insulation can also be integrated concurrently to provide increased thermal protection.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Henry, Christopher P Thousand Oaks, US 82 1170
Huffa, Bruce Encino, US 68 1884
Stewart, Tiffany A Sherman Oaks, US 10 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00