Connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11333216
APP PUB NO 20180298930A1
SERIAL NO

15765552

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector including: a first buffer member that includes a spiral-shaped wire in a plan view; a second buffer member that has a substantially annular and flat plate-like shape, and that is capable of warping in a thickness direction; a collar member that includes a cylindrical portion surrounded by the first buffer member and the second buffer member, a first flange facing a radially inner side of the first buffer member, and a second flange facing a radially inner side of the second buffer member; and a coupling member that includes a first holder section holding radially outer sides of the first buffer member and the second buffer member, a second holder section holding the shielding body, and a coupling member base portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NICHIAS CORPORATIONTOKYO 104-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Enami, Koki Tokyo, JP 5 8
Kato, Tadakatsu Tokyo, JP 9 23
Raita, Ichiro Tokyo, JP 3 7
Yoshino, Keiichi Tokyo, JP 6 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 17, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 17, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00