Ignition control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11333122
APP PUB NO 20190353134A1
SERIAL NO

16531195

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition control system performs discharge generation control, in which a discharge spark is generated, once or a plurality of times during a single combustion cycle. The ignition control system successively calculates an approximate energy density based on a secondary current and a discharge path length. During a predetermined period after blocking of a primary current is performed during a single combustion cycle, the ignition control system calculates an integrated value by integrating the discharge path length at this time, based on the approximate energy density being greater than a predetermined value. The ignition control system performs the discharge generation control again based on the calculated integrated value being less than a first threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Funato, Ippei Kariya, JP 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 17, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 17, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00