Fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11329300
APP PUB NO 20200168925A1
SERIAL NO

16601003

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell system includes a fuel cell stack, a mixed gas supply passage, and an agitation mixer. The fuel cell stack includes a plurality of fuel cells each including a power generation portion. The fuel cells are stacked. The mixed gas supply passage is configured to communicate with the fuel cell stack. The mixed gas supply passage is configured to supply a mixed gas to the fuel cell stack. The mixed gas is a mixture of a fuel gas and a fuel off-gas that has been discharged from the fuel cell stack. The agitation mixer is provided in the mixed gas supply passage. The agitation mixer is configured to apply a swirling force to the mixed gas. The agitation mixer includes a guide rib configured to guide liquid water contained in the mixed gas to a side opposite to the power generation portion-side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujio, Koro Toyota, JP 6 1
Kurita, Shuji Toyota, JP 9 23
Suzuki, Yushi Okazaki, JP 25 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00