Heating and hot-water-supply apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11326785
APP PUB NO 20210102713A1
SERIAL NO

16500397

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heating and hot-water-supply apparatus is provided with: a control unit that performs control on the basis of detection parameters of a plurality of detection means installed at the aforementioned locations and a setting parameter set in an operation unit. The distribution means can adjust the distribution ratio so as to correspond to a heating operation, a hot-water supply operation, and the simultaneous heating and hot-water-supply operation. The control unit prohibits the simultaneous heating and hot-water-supply operation in a case in which the required heating capacity for the hot-water supply operation calculated on the basis of the detection parameters and the setting parameter is equal to or greater than a predetermined standard capacity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORITZ CORPORATIONHYOGO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kageyama, Akihisa Hyogo, JP 13 9
Kawachi, Toshihiro Hyogo, JP 3 4
Kitano, Yoshihisa Hyogo, JP 20 93
Kuriyama, Yasutaka Hyogo, JP 16 198
Morimoto, Hiroshi Hyogo, JP 149 1047
Morita, Yasushi Hyogo, JP 53 582
Yokoyama, Midori Hyogo, JP 11 25
Yokoyama, Takehito Hyogo, JP 7 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00