Coal nozzle assembly for a steam generation apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11326774
APP PUB NO 20200158331A1
SERIAL NO

16635005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steam generating system includes a nozzle assembly for pulverized coal and air, the coal nozzle assembly comprises an inner housing (3) for conveying primary air and coal and an outer housing (5) for conveying secondary air to an exit face (13) of a nozzle tip (1), wherein the outer housing (3) and the inner housing (5) are arranged coaxially and limit a channel (15) for the secondary air, wherein the cross-sectional area (AIH) of the inner housing (3) increases towards the exit face (13) of the nozzle tip (1), wherein the cross-sectional area (AOH) of the outer housing (5) decreases towards the exit face (13), and wherein bars (11) are located in the inner housing (3) near the exit face (13) that accelerate the velocity of the primary air and coal particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC TECHNOLOGY GMBHBROWN BOVERI STRASSE 7 BADEN 5400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Krawiec, Joseph Windsor, US 1 0
Ladue, Rachel Windsor, US 2 0
Sapanaro, Michael Windsor, US 2 0
Vitse, Frederic Windsor, US 34 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00