Waste heat recovery boiler in producing glass beads

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11326773
APP PUB NO 20190093878A1
SERIAL NO

16133731

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A waste heat recovery boiler in producing glass beads includes an equipment base arranged at the lower part of the waste heat recovery boiler. The upper part of the equipment base is connected with a cylindrical combustion production chamber, the lower part of the combustion production chamber is provided with a raw material inlet with single-layer or staggered layers. A finished product outlet is arranged at the lower end inside the combustion diffusion chamber, a membrane wall is arranged outside the combustion diffusion chamber, a steam-water lead-out straight tube system is symmetrically arranged at the upper end of the combustion diffusion chamber, a top annular water collecting tank is connected between the steam-water lead-out straight tube system and a steam-water lead-out tube system, and the steam-water lead-out tube system is connected with an upper drum.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUANG SHANG YONGLIU QI YING XIANG GARDEN 065600 LANGFANG CITY OF HEBEI PROVINCE YONGQING COUNTY VILLAGE LANGFANG CITY HEBEI PROVINCE 065600

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Shang-Yong Langfang, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00