Lateral water intake structure for preventing silting of bed load and floating debris

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11326318
APP PUB NO 20220064888A1
SERIAL NO

17148584

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a lateral water intake structure for preventing silting of bed load and floating debris, which is provided at a river bank. The lateral water intake structure includes: a diversion canal, a guiding wall structure, a shaft-shaped water intaking space, and a trash rack. The lateral water intake structure functions to prevent the floating debris from gathering at the surface of the trash rack and reduce a risk that the trash rack is damaged by water pressure and hitting of the floating debris. Meanwhile, by using a water flow in the watercourse to continuously wash the floating debris near the trash rack, maintenance costs of removing the floating debris at the trash rack manually or mechanically can be reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA INSTITUTE OF WATER RESOURCES AND HYDROPOWER RESEARCH20 CHEGONGZHUANG WEST ROAD HAIDIAN DISTRICT BEIJING 100038 BEIJING CITY BEIJING CITY 100038
CHINA YANGTZE POWER CO LTD430014 SANYANG CENTER NO 88 SANYANG ROAD JIANG'AN DISTRICT WUHAN HUBEI PROVINCE WUHAN CITY HUBEI PROVINCE 430014

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Cuihua Hubei, CN 6 8
Deng, Anjun Beijing, CN 4 0
Guo, Qingchao Beijing, CN 2 0
Guo, Xinlei Beijing, CN 13 1
Lei, Tianjie Beijing, CN 6 3
Lu, Qin Beijing, CN 22 401
Shi, Hongling Beijing, CN 3 0
Wang, Dangwei Beijing, CN 2 0
Wang, Hantao Hubei, CN 2 0
Yin, Ye Hubei, CN 36 270

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00