Method for pre-stressing a steel structure, and steel structure pre-stressed using said method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11326313
APP PUB NO 20200299911A1
SERIAL NO

16874643

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
S&P CLEVER REINFORCEMENT COMPANY AGNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ghafoori, Elyas Dübendorf, CH 2 3
Motavalli, Masoud Forch, CH 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00