Abstract

See full text

A generator is installed on and provides electrical power from a turbine by converting the turbine's mechanical energy to electricity. The generated electrical power is used to power controls of the turbine so that the turbine can remain in use through its own energy. The turbine can be a safety-related turbine in a nuclear power plant, such that, through the generator, loss of plant power will not result in loss of use of the turbine and safety-related functions powered by the same. Appropriate circuitry and electrical connections condition the generator to work in tandem with any other power sources present, while providing electrical power with properties required to safely power the controls.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE-HITACHI NUCLEAR ENERGY AMERICAS LLC3901 CASTLE HAYNE ROAD WILMINGTON NC 28401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergman, Mark A Wilmington, US 7 28
Thinguldstad, Arthur M Wilmington, US 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00