Target supply device, target supply method, and electronic device manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11320740
APP PUB NO 20210364927A1
SERIAL NO

17228000

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A target supply device may include a first container configured to contain a target substance, a second container configured to contain the target substance supplied from the first container, a first valve disposed between the first container and the second container, a first pipe connected to the second container and configured to supply pressurized gas to the second container, a third container configured to contain the target substance supplied from the second container, a second valve disposed between the second container and the third container, a second pipe connected to the third container and configured to supply pressurized gas to the third container, and a nozzle configured to output the target substance supplied from the third container.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GIGAPHOTON INCTOCHIGI COUNTY JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hori, Tsukasa Oyama, JP 54 288
Nishisaka, Toshihiro Oyama, JP 35 276
Shiraishi, Yutaka Oyama, JP 48 214
Someya, Hiroshi Oyama, JP 30 304
Watanabe, Yukio Oyama, JP 145 2111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00