Arrangement for introducing a force from a fastening element into a plastic component and method for producing the arrangement

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11319983
APP PUB NO 20210180641A1
SERIAL NO

16714720

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arrangement configured to introduce a force from a fastening element into a plastic component, the arrangement including a force-limiting element that is embedded in the plastic component; wherein the fastening element is configured to fasten the plastic component at a body; wherein the fastening element is insertable through the force-limiting element, and wherein the plastic component includes a retention device which protrudes at least partially into an interior of the force-limiting element so that the fastening element that is inserted into the force-limiting element is retained in the force limiting element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECO HOLDING 1 GMBHGERMAN MARK HEIDENFELDER MARKTHEIDENFELD BAVARIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brower, Brent Muskegon, US 9 20
Carlson, Matt Whitehall, US 2 79
Stanhope, Daniel Nunica, US 17 50
Stolzman, Matt Muskegon, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00