Pitch process

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11319491
SERIAL NO

16882277

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for making mesophase and/or isotropic pitch. An aromatic rich liquid is charged at high temperature and pressure to a first thermal polymerization reactor to produce an effluent stream which is flashed to remove unconverted or partially converted feed as a vapor yielding a liquid phase enriched in isotropic pitch. The enriched isotropic pitch liquid is charged to a second thermal reactor and reactor effluent flashed to produce mesophase pitch and a vapor phase. The vapor phases from both flashing steps are condensed and combined for recycle of a liquid aromatic rich stream to the first reactor. Flashing from the first reactor cools the liquid phase which is enriched in isotropic pitch. This enriched stream is mixed with a superheated fluid, preferably steam, upstream of the second reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACP TECHNOLOGIES LLC20527 STEPHENS STREET ST CLAIR SHORES MI 48080

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boyer, David C Fleming Island, US 23 193
Holcombe, Thomas C Hillsborough, US 16 142

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00