Vapor source using solutions of precursors in tertiary amines

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11319452
APP PUB NO 20160115328A1
SERIAL NO

14895373

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure relates to tertiary amine solutions of metal precursors used for chemical vapor deposition or atomic layer deposition. The tertiary amine solutions have many advantages. They dissolve high concentrations of non-polar precursors without reacting with them. They do not supply impurities such as oxygen or halogens to the material being produced, nor do they etch or corrode them. Vaporization rates can be chosen so that the solute and solvent may be evaporated simultaneously, have high flash points, and low flammability. Small droplets may be formed easily which facilitate rapid evaporation without decomposition of he dissolved metal precursor to supply vapors for chemical vapor deposition or atomic layer deposition processes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRESIDENT AND FELLOWS OF HARVARD COLLEGE17 QUINCY STREET CAMBRIDGE MA 02138

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gordon, Roy Gerald Cambridge, US 24 359

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00