Glass manufacturing process

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11319235
APP PUB NO 20210094859A1
SERIAL NO

16590077

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a process for manufacturing glass, a mixture of solid glass-forming materials may be melted by application of heat from one or more submerged combustion burners to produce a volume of unrefined molten glass comprising, by volume, 20% to 40% gas bubbles. A refining agent may be introduced into the unrefined molten glass to promote gas bubble removal from the molten glass. The unrefined molten glass including the refining agent may be heated at a temperature in the range of 1200° C. to 1500° C. to produce a volume of refined molten glass. The refined molten glass may comprise, by volume, fewer gas bubbles than the unrefined molten glass. A colorant material may be introduced into the refined molten glass to produce a volume of molten glass having a final desired color.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OWENS-BROCKWAY GLASS CONTAINER INCONE MICHAEL OWENS WAY PERRYSBURG OH 43551

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhaduri, Sutapa Holland, US 7 56
Iddings, Earnest R Sylvania, US 1 10
Lin, Ya-Cheng Jersey City, US 7 24
Schoenrock, Nicholas A Rudolph, US 5 21
Townsend, Casey Perrysburg, US 4 10
Vempati, Udaya Ottawa, US 12 49
Wang, Zhongming Ypsilanti, US 45 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00