Secondary battery and electronic device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11316189
APP PUB NO 20190288325A1
SERIAL NO

16423904

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide a secondary battery that is suitable to a portable information terminal or a wearable device. To provide an electronic device having a novel structure that can have various forms and a secondary battery that fits the forms of the electronic device. The secondary battery includes a film provided with depressions or projections that can ease stress on the film due to application of external force. The sizes of the depressions or projections are different between a center portion and an end portion of the film. The end portion of the film is sealed with an adhesive layer. The depressions or projections of the film are formed by pressing such as embossing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDKANAGAWA KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furumatsu, Daisuke Kanagawa, JP 21 192
Hiroki, Masaaki Kanagawa, JP 266 8801

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00