Redundant power source for increased reliability in a permanent completion

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11313206
APP PUB NO 20210172295A1
SERIAL NO

15778072

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A completion system and a method for powering a downhole component of a wellbore are provided. In one example, in the completion system comprises at least three different types of power sources for powering a downhole component in a wellbore and a power distribution circuit including a power distribution node and a control circuit, wherein the control circuit is configured to select at least one power source of the at least three different types of power sources to connect to the power distribution node based on a selection priority of the power sources, and the power distribution node is configured to provide power from the at least one power source to the downhole component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Flygare, James Humble, US 4 22
Fripp, Michael Linley Carrollton, US 369 2820
Frosell, Thomas Jules Irving, US 60 289
Ornelaz, Richard Decena Frisco, US 30 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00