Pumping device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11313108
APP PUB NO 20210095445A1
SERIAL NO

17034409

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pumping device has a container, an inlet pipe, a float barrel, and a discharging pipe. The container has a box containing water and a first gas, and a pressure gauge and a check valve mounted to the box. The inlet pipe connects to a water supply and has a second section erectly disposed within the box and communicating with an inside of the box. The float barrel is disposed within the box, contains a second gas, and has an opening. The second section is mounted through the opening. The discharging pipe has two opposite ends respectively communicating with a water reservoir and the inside of the box. The first gas has a pressure larger than 1 atm. The second gas has a pressure less than 1 atm. Water enters the float barrel. A water level inside the float barrel is higher than a water level inside the box.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEN CHUNG MINNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chung-Min Taichung, TW 12 401

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00