Automobile hub of multilayer rim, hub assembling method and automobile

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11312175
APP PUB NO 20200254812A1
SERIAL NO

16550615

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automobile wheel having a multilayer rim includes a wheel disc and a rim that is composed of at least two layers of metal rings by nesting, and a gap is preset between two adjacent metal rings; an outer side of one end of the wheel disc includes axial rim mounting grooves, and one end of the rim is inserted into the rim mounting grooves to fix the rim to the wheel disc.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CITIC DICASTAL CO LTD066318 LONGHAI ROAD QINHUANGDAO ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE HEBEI 185 QINHUANGDAO CITY HEBEI PROVINCE 066318

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Chuan Qinhuangdao, CN 7 0
He, Zenglei Qinhuangdao, CN 2 1
Li, Changhai Qinhuangdao, CN 58 95
Li, Hongbiao Qinhuangdao, CN 27 201
Li, Zhen Qinhuangdao, CN 370 1800
Wang, Xu Qinhuangdao, CN 406 1331
Zhou, Yule Qinhuangdao, CN 10 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00