Composite pane having electrically controllable optical properties

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11312111
APP PUB NO 20210078300A1
SERIAL NO

16620251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite pane having electrically controllable optical properties, includes an outer pane and an inner pane that are joined to one another via a thermoplastic intermediate layer, wherein a functional element having electrically controllable optical properties is embedded in the intermediate layer, the functional element including an active layer between a first carrier film and a second carrier film, wherein the intermediate layer contains a first thermoplastic material and the carrier films contain a second thermoplastic material, and wherein the first carrier film and the second carrier film are fused together along at least one region of the side edge of the functional element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAINT-GOBAIN GLASS FRANCETOUR SAINT-GOBAIN 12 PLACE DE L'IRIS COURBEVOIE 92400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dröge, Alicia Aachen, DE 15 12
Klein, Marcel Baesweiler, DE 41 100
Labrot, Michael Aachen, DE 56 753
Schmidt, Georg Langerwehe, DE 45 387
Yeh, Li-Ya Geilenkirchen, DE 32 190

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 26, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 26, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00