Data reader with view separation optics

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11308294
APP PUB NO 20180121694A1
SERIAL NO

15336174

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a data reader and method of data reading for an imager with multiple fields of view, including directing a first field of view of the imager along a first path, directing a second field of view of the imager along a second path, and alternately selecting one of the first view or the second view via a view splitting/combining system comprising a rotating mechanism (e.g., a disk), disposed in the view path of the imager, the disk having reflective and transmissive/open portions. The system may include synchronization between rotation of the rotating disk and the imager, one synchronization comprises using a magnet on the rotating disk and a Hall sensor on a printed circuit board beside the rotating disk, the Hall sensor output then being used to synchronize image capture to motor position. Other synchronization methods are disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DATALOGIC USA INC959 TERRY STREET EUGENE OR 97402

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, WenLiang Eugene, US 47 779
Shearin, Alan Eugene, US 35 1465

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00