Elevator with safety chain overlay control unit with a safety PLC separately monitoring various safety switches for increasing a safety integrity level

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11305965
APP PUB NO 20190300337A1
SERIAL NO

16317227

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An elevator has a drive unit displacing an elevator car in an elevator hoistway, an elevator controller controlling operation of the drive unit, multiple safety switches switchable upon occurrence of safety relevant events, and a safety chain overlay control unit including a safety PLC. The PLC has first connectors connected to first safety switch contacts and second connectors connected to second safety switch contacts. The PLC monitors a current safety status of the elevator and identifies a safety critical status by detecting when at least one of the safety switches changes its switching state and comparing the current switching states of the first and second safety switches. The PLC interrupts a main energy supply to the drive unit in response to the safety critical status of the elevator. Comparing switching states of the safety switches connected to the first and second connectors also enables detecting faulty safety switches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INVENTIO AGSEESTRASSE 55 HERGISWIL CH-6052

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lindegger, Urs Ebikon, CH 12 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00