Hybrid lighter-than-air vehicle
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Apr 19, 2022
Grant Date -
N/A
app pub date -
Dec 20, 2019
filing date -
Dec 20, 2019
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The present invention is a variable geometry aircraft that is capable of morphing its shape from a symmetric cross-section buoyant craft to an asymmetric lifting body and even to a symmetric zero lift configuration. The aircraft may include variable span, length, and camber. The variability of the structure and the flexible envelope allows the aircraft to adjust its aspect ratio along with the camber of the upper and/or lower surfaces to achieve varying shapes. This transformation changes both the lift and drag characteristics of the craft and may be accomplished while the craft is airborne.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
HYALTA AERONAUTICS INC | 1191 DARLINGTON OAKS DR NE SAINT PETERSBURG FL 33703 |
International Classification(s)

- 2019 Application Filing Year
- B64D Class
- 2685 Applications Filed
- 1785 Patents Issued To-Date
- 66.49 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Kempshall, Scott R | St. Petersburg, US | 21 | 55 |
# of filed Patents : 21 Total Citations : 55 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Oct 19, 2025 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Oct 19, 2029 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Oct 19, 2033 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
