Container with product visualization aperture

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11305493
APP PUB NO 20200316871A1
SERIAL NO

16909206

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for providing a product viewing window in a container. The container has at least a body ply and a liner ply, wherein the body ply has at least one aperture therethrough. The liner ply is adhered across the aperture, forming a window into the container. A window-finishing machine that comprises at least two platens and, optionally, a machine pocket positioned between them, a heating element extending through at least one of the platens, and a pressurized air device engages a container. The heating element heats the window of the container to the desired temperature, pressurized air is injected into the container such that the window is forced at least partially through the aperture of the container (and optionally into contact with the machine pocket wall), and the container window is then cooled to the desired temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SONOCO DEVELOPMENT INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clougherty, Kenan James Hartsville, US 9 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00