Process for producing a cured 3D product

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11305458
APP PUB NO 20200189146A1
SERIAL NO

16712275

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to a process for producing a cured 3D product comprising the following steps: (a) providing a form negative mould of the 3D product comprising of one or two formed plastic sheets as obtained by thermoforming corresponding with the shape of the 3D product; (b) adding a liquid curable composition to the mould such that the inner surface of the mould is covered by the curable composition; and (c) solidifying the curable composition wherein a solidified layer or body is formed having the shape of the 3D product; wherein the cured 3D product is a radiation cured 3D product; and wherein the step (c) a radiation curable composition is solidified by radiation through the plastic sheet of the mould to form a solidified layer having the shape of the 3D product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WHAT THE FUTURE B VZEEMAGAZIJNKADE 3 AMSTERDAM 1018 LE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kyttanen, Janne Tuomas West Hollywood, US 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00